Thursday, August 13, 2009

Little reorganizing

As you can imagine, the garage is getting a bit cluttered with the whole interior of the trailer stored in there, plus all the appliances, tires, tools, building materials, and now, transmission rebuilding space.

Last night I did some cleaning/organizing. Moved things I won't need for a long time into the basement, organized the rest in order of need. Decided I'd move the lower cabinets into the trailer for storage. The refrigerator is next.

This helps me visualize how things fit together, and gets them out of my work area.

Front LH side. This cabinet is sort of a headboard when the dinette turns into a bed.


Inside of the cabinet that holds the stove:


Sink cabinet. This one has the most damage.



Oops. I guess that's my thumb. This is the other side of the stove cabinet with the smaller sub-cabinet inset for clearance to the dinette booth.



View towards the front.


Ditto:


Sink cabinet. Refrigerator/furnace cabinet goes to the left.



Stove cabinet:


Another view towards the front.


All the panelling was water damaged on the front panel. Based on where the cabinets fit, I'm hoping to scavange panelling from behind them to cover the front and any other exposed damaged areas. Hopefully, I'll have enough.

No comments:

Post a Comment