Monday, October 19, 2009

Inside pics

Jennifer took some pics of the recent progress...

Here's looking into the bathroom. Walls are just about done (covered in FRP). Access panel by the window is for the rear view camera and antenna.

Lower access will be under the sink cabinet, for the cable connections and power.



Other side of the bathroom. Tub drain plumbing is all set. Haven't fastened the tub in - the outside shower goes under the seat.

The original skirt (in pretty bad shape) has a door to access the tub plumbing. The outside shower box is new and the toilet will block access even if I had a door. Been contemplating how to solve that and came up with a decent idea - the shower box insert into its frame goes in from the outside. It's held in place by tabs that snap and have to be released from inside. If I grind off the snap tabs and drill holes for stainless screws, then I can make the shower box removable from outside. I'll use stainless braided hoses under the tub that attach somewhere accessible.

(The frame is for the overhead vent)
Here's a view looking forward. The overhead cabinet/bunk is in up front. The two upper cabinets are mostly in (I need some more screws to wrap it up). Other cabinets are just in place for measuring but aren't fastened. I need to finish up the front wall so I can fit everything in place - some of the cabinets will need trimming.

Refrigerator cabinet is finally up and the fridge is off the floor and out of my way. Area below fridge was used for microwave by previous owners (they took out the furnace) but I need it for the furnace. Wish I had it installed already - it sure got cold yesterday.










No comments:

Post a Comment