Made some progress since last posting.

Front


Side - looks like rain's coming...

In the meantime, the transmission of the truck died and I had to take a detour from the camper to rebuild it.
Fall is here and I'm running out of season - we still hope to take the TT out before it gets too cold.
3/4 of the ceiling is in. I thought I took pics, but I guess I didn't. It's exterior luan covered in white FRP panel. Ceiling area rewired. New lights ready to install. I'll snap some pics when I get back inside.
Outside - painted most of the roof - I noticed black streaking was starting and deduced it was the bare aluminum. Got 80% covered with white before I ran out of paint. Have to get more and finish it up. Wasn't sure I'd have another nice weekend w/o rain so I taped out the stripes this morning - a lot of the exterior items are waiting on the stripe painting. Also installed the water heater, electric hatch, and the two water hatches - not hooked up inside yet, but sealed to the out.
Here is a pic of it taped up. Had we known how nice it would look with lime green accents, I'd have ordered lime green paint.
Here she is all painted with the tape removed. There are some areas with some edge bleeding - especially the entry door, that I'll have to touch up. Probably next year.
On the sides and back, the double stripes come together where a corner or tail light gets installed.
Front
Side - looks like rain's coming...